 Riverside Badlands TunnelClient: Metropolitan Water District Location: Moreno Valley, CA Start Date: July 1998 End Date: November 2002 Contract Amount: $120 million
This joint venture of M.L. Shank, Co. and Balfour Beatty Infrastructure,
Inc. involved driving more than 42,000 feet (about eight miles) of
18-foot diameter mixed face tunnel with a boring machine.
The $120 million tunnel project, which began in July 1998, was designed to meet the ever-increasing need of water
transportation to the greater Los Angeles area.
This
project included installation of 12-foot diameter pressure pipe inside
the excavated tunnel. There was additional site work at both of the
portals to extend the pipe.
|